NHS Data Management

Training Course Objectives

From experience with working with some NHS trusts it has been identified that there is a need for some support in the management of data. These Data Management Requirements range from mapping excel data to ESR, Mass Data loads and Data Cleansing.


Who Should Attend

  • ESR Representatives

Training Course Prerequisites

  • Pre Scoping Call between iTrain Education Consutant and Trust Representative

Training Course Duration

1 Day


Preparation before onsite visit

Pre Scoping Call between iTrain Education Consutant and Trust Representative

  • This call will identfy what areas the trust are wanting to focus on and what they feel there present problems are. This initial call will also identify what the iTrain and Trust responsibilities and next steps are before the visit.

Gathering of all external data sources

  • The trust will need to gather all external data sources such as any excel reports and be aware of any other databases that are being used in paralell with ESR.

Post, Pre Scoping Call from Account Manager

  • This call will be to book a date for the sit visit, clarify responsibilites and site details.

Onsite Task List

Morning Meeting

  • The morning meeting will involve discussing the data issues presently faced, such as data itegrity, duplicate entry or multiple data sources.

Legacy to ESR Mapping

  • With all the data sources identied time will then be spent mapping the data points to fields in ESR.

Solution Arcitecture

  • In instances were legacy systems are bing used for the management of data that runs paralell with ESR a solution design with be drawn up for the interfacing, migrating or management of that data in a more seamless manor.

Draft Proposal of Support

  • A full proposal will be written by the Consultant, incorporating the results of the mapping any solution designs, consulting requirements and a suggested plan of action to cater for the requirements.

Post departure meeting to discuss outcome

  • A half hour meeting will be arranged for the end of the consulting day to disucss the outcomes of the Data Analysis, a topline overview of the proposal and any other ESR requirements that may require discussion.

Post Visit

Commercial Proposal

  • The proposal that has been written by the Consultant will the be reviewed by the commercial team and a relevant cost applied to the suggested plan of action.

Follow up call from Account Manager

  • The account manager will then make contact after the release of the proposal to discuss if there is any further support required.

Training Services






Room Rentals


London Office

Find Us
Clerks Court
18-20 Farringdon Lane
Clerkenwell
London
EC1R 3AU
uksales@itrainconsulting.co.uk
Tel: +44 (0)207 608 1835
Fax: +44 (0)207 490 3465

Edinburgh Office

Find Us
2nd Floor
37 George Street
Edinburgh
West Lothian
EH2 2HN
uksales@itrainconsulting.co.uk
Tel: +44 (0)131 226 6620
Fax: +44 (0)131 226 6650

Leeds Office

Find Us
Bruntwood, 6th Floor, WESTONE
Wellington Street
Leeds
W. Yorkshire
LS1 1BA
uksales@itrainconsulting.co.uk
Tel: +44 (0)207 608 1835
Fax: +44 (0)207 490 3465

Manchester Office

Find Us
MWB
Pall Mall Court
61 - 67 King Street
Manchester
M2 4PD
uksales@itrainconsulting.co.uk
Tel: +44 (0)207 608 1835
Fax: +44 (0)207 490 3465